Agreement 0002403, filed with the Texas Comptroller by Polk County, Texas.
The remedy here is discretionary — the clause says it may be applied, not that it must be.
Where a deadline above has passed, no public record exists of whether it was met — not in the Comptroller’s filings, nor in the local government’s own disclosures. That is not evidence of non-compliance. Texas requires nobody to record it.
A local abatement waives only that taxing unit’s share of the property tax bill. School districts, counties, cities and hospital districts each sign separately.
| Field | Value & quoted source | Page |
|---|---|---|
| Granting body | Polk County, TexasTAX ABATEMENT AGREEMENT Between POLK COUNTY, TEXAS and LONE SPUR SOLAR ENERGY LLC | 1 |
| Contracting entity | Lone Spur Solar Energy LLCTAX ABATEMENT AGREEMENT Between POLK COUNTY, TEXAS and LONE SPUR SOLAR ENERGY LLC | 1 |
| Parent / guarantor | InvenergyPolk County 312 Reinvestment Zone โ Lone Spur Solar Energy LLC Polk County, Texas September 24, 2021 Invenergy | 23 |
| Instrument | Tax Abatement AgreementTAX ABATEMENT AGREEMENT | 1 |
| Governing chapter | Chapter 312, Tax Code (property tax abatement)TAX CODE ยง312.002(d), that this Agreement should be entered into notwithstanding any such inconsistency, and (ii) constitute a major investment in the Reinvestment Zone that will be a benefit to the Reinvestment Zone and will contribute to the economic development of the County. | — |
| Capital investment | Not stated in the agreement | — |
| Grant or incentive | Not stated in the agreement | — |
| Jobs committed | One (1) new full-time jobOwner agrees to provide and maintain during the Abatement Period, not fewer than One (1) new full-time job | 5 |
| Wage requirement | Not stated in the agreement | — |
| Square footage | Not stated in the agreement | — |
| Acreage | 1,200 acreswill be sited on up to approximately 1,200 acres | 29 |
| Performance deadline | December 31, 2024will be substantially completed by December 31, 2024 | 2 |
| Expiration | Not stated in the agreement | — |
| Effective date | September 28, 2021effective as of September 28, 2021 | 1 |
| Signatory | Jonathan SaxonJonathan Saxon Senior Vice President of Development Lone Spur Solar Energy LLC | 41 |
| Chain status | Terminal document — no later agreement in the registry names this one as its predecessor | — |
- approximately 225,000 โ 325,000 solar modules/panels - 20 โ 40 inverters - metal mounting system with tracking capabilities - battery or battery system - underground conduit - communications cables and electric system wiring - combiner boxes - a project substation including breakers -a transformer and meters - overhead transmission lines - control house - an operations and maintenance facility - fencing for safety and security - telephone and internet communication system - meteorological equipment to measure solar irradiation and weather conditions.
Open the signed agreement (PDF, Texas Comptroller) →
Agreement 0002403 is filed with the Texas Comptroller. Pull the PDF, go to the page number beside any row, and read the sentence. If a figure here does not match the document, tell me and it is corrected the same day.
Where the contract says nothing, the field is left empty rather than filled with a guess.
For a specific agreement, I read the signed PDF and send back every obligation, deadline and repayment clause, quoted with its page.